Skip to content
Open pricing

Every price on the page. Every extra listed.

We publish our prices so you can compare quotes properly. Your final quote comes after a free site survey and only changes if your roof needs one of the extras listed below.

System₹ / kWPriceCentral subsidy+ Rajasthan*You payEMI 5 yrs
1.1 kW₹86,000₹94,600− ₹33,000− ₹17,000₹44,600₹857/mo
2 kW₹86,000₹1,72,000− ₹60,000− ₹17,000₹95,000₹1,826/mo
3 kW₹70,000₹2,10,000− ₹78,000− ₹17,000₹1,15,000₹2,210/mo
4 kW₹66,000₹2,64,000− ₹78,000− ₹17,000₹1,69,000₹3,248/mo
5 kW₹63,000₹3,15,000− ₹78,000− ₹17,000₹2,20,000₹4,228/mo
6 kW₹60,000₹3,60,000− ₹78,000− ₹17,000₹2,65,000₹5,092/mo
8 kW₹60,000₹4,80,000− ₹78,000− ₹17,000₹3,85,000₹7,398/mo
10 kW₹60,000₹6,00,000− ₹78,000− ₹17,000₹5,05,000₹9,704/mo

*If eligible under the Rajasthan 150-unit scheme. Prices include GST, on-grid, DCR panels, installation, net-meter application. Indicative as of Nov 2026.

Included in every system

  • Made-in-India DCR panels (ALMM-listed), 25-year performance warranty
  • BIS-certified on-grid inverter with Wi-Fi monitoring
  • Hot-dip galvanised raised structure, wind-rated
  • DC/AC cables, earthing, lightning arrester, AC/DC distribution boxes
  • PM Surya Ghar portal registration and JVVNL net-meter paperwork
  • Installation, commissioning and a 5-year workmanship warranty

Possible extra costs

These only apply if your site needs them. We'll tell you at the survey, before you commit.

Extra-high structure (over 8 ft)quoted at survey
Cable run longer than 30 mper metre
JVVNL net-meter / testing feeas charged by JVVNL
Hybrid inverter + batterysee planner
Cleaning & maintenance planoptional, yearly
Comparing quotes?

Ask every installer these 8 questions.

A cheaper quote often means a thinner structure, unbranded cables or panels that don't qualify for subsidy.

  1. Are the panels DCR and on the ALMM list? If not, you lose the subsidy.
  2. Which panel and inverter brands exactly, and which wattage?
  3. Is the vendor registered on the PM Surya Ghar portal?
  4. Is the structure hot-dip galvanised, and what's its steel gauge and height?
  5. Who handles JVVNL net metering and the subsidy, and is that included in the price?
  6. What's the workmanship warranty, and does it cover roof leakage?
  7. Is monitoring included, and who responds if generation drops?
  8. Does the price include GST, transport and earthing?

Got another quote? Send it to us and we'll compare it line by line for free, even if you don't choose us.

Get your free site survey

A visit from our engineer to measure your roof and check the shade, then a fixed quote with no surprises. We do the PM Surya Ghar and JVVNL paperwork.

WhatsAppCall